Wednesday, December 26, 2018
'Description of Proposed Network Essay\r'
'Our proposal involves the development of a LAN able to meet the requirements of your conjunctionââ¬â¢s software. The computer earnings components include the use of a emcee, a switch, post panel, and a router for the office. The selected NOS (Network Operating System) is Windows two hundred0 host. This operating constitution provides great conveniences to the inst whollyation, configuration, and maintenance of the interlock. Windows 2000 boniface provides the enhanced DHCP, DNS and WINS features allow a intercommunicate administrator to expediently manage all clients on the network. The data communication media for the networks is UTP CAT5. This cabling follows the Ethernet standards for transmission control protocol/IP and chinks decreased propagation and noise.\r\nI understand the motivations for creating a network and washbasin apply these technologies to improve communications and ingress to information, as well as jut out and maintain the infra organise.\r\nGo als and Products:\r\nThe quest list is networking hardware that lavatory be implemented:\r\n*Nortel Networks pass 2430 Enterprise Router: Offers the features and performance of more valuable routers, but at a lots lower price. Also, this unit is known for its legato operation, and sleek enclosure.\r\n*Nortel Networks BayStack 350 Series Switch: supports high-utilization workgroups for high-bandwidth uplinks to legions.\r\n*dell PowerEdge 650 Server: Cost-effective rack waiter performance, manageability, and serviceability. Easy to mange. Also with tape target backup support.\r\n*Nortel Networks OPTera Metro Cabinet 5200: Free-standing structure which give hold router, switch, server, and piece panel.\r\n*16-port fixing venire\r\nEach employee workstation is to be custom-built arranged from Dell. Each employee will theater a Dell computer with the followers options:\r\n*2 GHz Pentium 4 central processor\r\n*256MB mob\r\n*13GB Hard Drive\r\n*Netgear FA311 10/ degree Celsius Network adapters\r\n*52X CD-Rom\r\n*8 MB Video Card\r\n*17ââ¬Â³ monitor lizard (Can use current monitors if reckon is exceeded)\r\n* interior Zip Drive\r\n quick Ethernet is the protocol of choice. The wiring is a high quality than the Category 3 usually used by Ethernet, therefore is a bit more expensive, but a worthy advantage. Fast Ethernet defines a school principal topology. There are many advantages in designing a LAN establish on a star topology. It allows working out to the existing LAN without effort or disruption. Troubleshooting, repair, and maintenance can be urbane to a failed node without holding up or disrupting work on another(prenominal) nodes.\r\nThe first step of implementing the network involves racecourse drops in two corners of the office. The switch, router, patch panel, and server will be located in a rack closet dedicate to LAN equipment. This rack will be placed in a spatial relation for centrality. The entire office will be cabled wit h category 5 unshielded-twisted pair cable. smother faceplates to include both drops and a call up jack will be put uped. Panels spanning each wall will house cables to ensure a clean look. As can be expected, the physical cost to install these drops are minimal, the labor is the majority of this expense.\r\nThe befriend step of implementing the network involves configuring each found of networking equipment. The router will be set up to ensure serviceability and reliability amongst employees and the server. From the router there will be a switch attached. The router will service a protocol (DHCP) which will allow workstations to ingress the network. The patch panel will be used as a tangency between the user and the switch. 1ft cables will be used to connect the switch and patch panel with also the use of a punch-down block.\r\nThe third step of implementing the network involves configuring the server. This server will be set up to store crucial data, backup data, directory serve (User Management), and file and print services. From the server you will have control and full access code to each employeeââ¬â¢s machine.\r\nSpecifications:\r\nHardware plays an authorised role in reliability of a network. Each workstation is to be custom ordered from Dell. Each employee will house a Dell computer with the following options:\r\n*2 GHz Pentium 4 Processor\r\n*256MB RAM\r\n*13GB Hard Drive\r\n*Netgear FA311 10/100 Network adapters\r\n*52X CD-Rom\r\n*8 MB Video Card\r\n*17ââ¬Â³ Monitor (Can use current monitors if budget is exceeded)\r\n* interior(a) Zip Drive\r\nIn appendage the office will house a Hewlett Packard LaserJet 4000N due to estimated heavy printing volume. The network equipment will be housed in a rack mount closet. That equipment will rest of a Dell PowerEdge 650 Server with the following components:\r\n*3.06GHZ Pentium 4 Processor 512K internal L2 Cache,\r\n*1GB error correction code DDR266 Memory,\r\n*Netgear FA311 10/100 Network adapt er,\r\n*16x4GB small computer system interface Hard Driveââ¬â¢s,\r\n*3.5ââ¬Â³ Floppy Drive, CD-ROM, and Internal Zip Drive.\r\nThe hard hinge uponââ¬â¢s in the server will be partitioned into a public working movement and a back up drive and will also be apply RAID 5.\r\nEquipment and tote Costs:\r\nEquipment:\r\n* laissez passer 2430 Enterprise Router â⬠$349.99\r\n*BayStack 350 Series Switch â⬠$714.99\r\n*PowerEdge 650 Server â⬠$1499.99\r\n*OPTera Metro Cabinet 5200 â⬠$1299.99\r\n*12-port Patch Panel â⬠$119.99\r\n*Cabling Costs:\r\noUTP CAT5 Cable 650FT (~60ft per workstation) â⬠$500\r\no(48) RJ-45 Connecters â⬠$200\r\n*(10) Custom Dell Workstations featuring Windows 2000 â⬠$6000\r\n*(11) 17ââ¬Â³ Monitors â⬠$1100 (Save this by using current monitors)\r\n*HP 4000N LaserJet newspaperman â⬠$200\r\n* flavour at a total for equipment just shy of $12,000\r\nLabor:\r\n*Flat hourly rate of $90/HR.\r\n*Project will take 5 business days (8hr/day limit).\r\n*Looking at a total for labor- $3600\r\nAn estimated Grand-Total- $16,000*\r\n*This configuration is based on new domain of the art equipment and software. Every item has been guardedly examined to ensure it offers the most for the needs of productive Accounting. Cost may be thin out if the need arises, however, efficiency and technology will be sacrificed. All in all, this network has been developed with the sole purpose of cheering the companyââ¬â¢s needs inwardly realistic constraints.\r\nPlease feel clear to contact me with any questions regarding this proposal.\r\n'
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment